Skip to content
Laboratory 17

For companies

Joint projects from culture to production

Tell us about your objective: biomass for processing, ingredient development or a cultivation process. We will define the requirements and prepare a pilot programme aimed at scale-up and implementation.

Material requirements

Our first focus is fucoxanthin. Which components do you need?

  • Fucoxanthin

    We are studying requirements for biomass as a raw material for fucoxanthin. Tell us about the content you need, the form of the material and your processing route.

    Describe your need
  • Phycocyanin

    We are studying requirements for raw material for this blue pigment. Do you need biomass for processing or a ready-made colorant? Tell us the form and conditions of use.

    Describe your application
  • Phycoerythrin

    We are studying requirements for raw material and development of this pigment, including for research purposes. We will clarify the type of material and its analytical characteristics.

    Discuss requirements
  • Another task for biomass

    Let's discuss composition requirements for your formulation or aquaculture process.

    Describe your application

For a specific product we define the material's composition, analyses and conditions of use.

The field of application is chosen independently: formulation, extraction, aquaculture, research.

Our first focus

Biomass for fucoxanthin production

We cultivate the marine diatom Nanofrustulum in artificial seawater. We are developing biomass production for fucoxanthin extraction. With a processor, we agree on biomass specifications and a programme to assess a trial batch.

  1. 01

    Trial batch

    We define the form of the material and the list of batch analyses, including fucoxanthin content.

  2. 02

    Who it is for

    Ingredient developers and extract manufacturers. We discuss raw material requirements and the terms of sample evaluation.

  3. 03

    Next stage

    Fucoxanthin extraction is a separate programme: yield, quality and process costs for a specific product.

Propose a task for the next joint algae project.

Describe your need for fucoxanthin

Project outcome

What a company receives from a project

Technology and culture transfer is arranged under a separate agreement.

  • An agreed technical specification
  • A description of the tested cultivation conditions
  • A trial batch
  • A batch information sheet
  • Analytical reports for the agreed parameters
  • A test results report
  • Conclusion on the material's suitability and an assessment of scale-up

How the material is selected

From composition requirements to a confirmed batch

The composition and origin of the selected material are recorded in the documentation, and characteristics for each batch.

  1. 01

    Composition requirements

    We record the substance or characteristic needed, its content, form and application.

  2. 02

    Selecting biomass

    We identify a suitable material and check the presence of the component, its origin and conditions of use.

  3. 03

    Assessing processing

    We clarify who extracts the component and what is needed at the output: biomass, an extract or a purified pigment.

  4. 04

    Batch confirmation

    Composition, parameters, methods and storage conditions are recorded for each batch.

Scientific basis

Project stage

Where we are now

We run research and pilot programmes. Batch characteristics, timing and cost are set together once the task has been discussed.

  • Tell us about your task and the requirements you already know. We will work out the rest together
  • The work programme sets out which batch parameters to measure and by which methods
  • For every result we state the scale: laboratory, pilot or production

Your material requirements

Four steps, about 10 minutes. No registration needed.

Take the survey

Contact us

Tell us what you would like to discuss. We will reply to the email address you provide.

Contact us

Topic (required)

By submitting, you confirm that you have read the policy and consent to the processing of the data you entered for requirements analysis and follow-up. Details are in the privacy policy.